Our customer Hermo Prefabricados de Hormigón S.L. specialises in high-quality elements for residential construction, both single and multi-family. To meet the wide range of element dimensions and requirements, a flexible and easy to handle formwork solution was required. Previously, the plywood was glued to the pallet with supporting ribs, which involved a lot of manual labour and high material consumption. A faster and more resource-efficient solution is now offered by the MST, which at the same time contributes to an increase in productivity and requires less manpower. In times of skills shortages, this is an important factor.
Find out more about the MST formwork system here on our website.