Reymann Technik GmbH / Company / References / Upcrete® Batteriefertigung für Massivwand

Solid Wall Plant, Upcrete® Battery Production

Performance RT: 

• Planning

RATEC:

• Delivery

• Assembly

• Commissioning

Plant Capacity: 120 m² Sandwichwalls in 2 x 8 hours

Hall: Area 380 m², Clearance 7,59 m

Personnel: 4 employees/shift

Plant concept:

• wall thickness 60 - 420 mm

• wall height up to 3.500 mm

• 1 pair of outer mould (moveable)

• 3 pair of inner moulds L/W 9,0/3,5 m moveable + concreting from both sides

• moveable face-sided shuttering at the inner mould, useable for all wall thicknesses without adjustment works

• Adjustment of wall height via magnet shuttering from the top

• Magnet shuttering inside

• Heating system inside the inner and outer mould

• Transport of concrete via pump UPP and inlet UCI from the bottom

• Work station system for vertical preparation of reinforcement including sandwich insulation with all connections

Project description

Planned and realized in co-operation with the customer.

Your Contact

Andreas Gewis

Leitung Reymann Technik

Tel.: +49 (0) 6205 9407-0
Fax: +49 (0) 6205 9407-20

Email: agewis@reymann-technik.de

RATEC / Service

Downloads

You can find all information you need in our Downloadcenter.

Downloadcenter

The only source for precast formwork technology, that you need.

The new RATEC product catalog

Read online

Or order your free copy here.