Reymann Technik GmbH / Company / References / Massivwand Sonderteile

Solid Wall Plant, Special elements

Performance RT: General contractor

• Planning

• Construction service

• Delivery

• Assembly

• Commisioning

• Know-how transfer

• Project management

Plant capacity400 m² solid wall/shift

Hall: Area 2.400 m², Clearance 7,59 m

Personnel: 14 employees/shift (wall)

Base for plant concept:

• Existing hall Length x width 127 x 25 m

• Portal crane moveable inside the hall

• Existing pre-stressing line for hollow core slab production

• Available net area for the plant: Lenght x width 155 x 7,0 m!

Plant concept:

• solid wall 127 - 254 mm

• 24 pallets L/W 13,0/4,02 m

• Vertical circulation with a width of only 7 m!

     - Automated rack feeder

     - Curing chamber for 14 pallets

     - Lift off at ±0,00

     - Automatic lifting station

     - Moulding at +1,15

     - Reinforcement at +1,15

     - Lowering station

     - Concreting, compating and smoothing at ±0,00

     - Pre curing tunnel at ±0,00 m

• With tilting bypass station

• With Laser projection

• Concrete transport via bucket conveyor

Project description

Conclusion:

The "smallest circulation" plant for wall thickness up to 3,54 m!

Target was to reduce employee cost by increasing production quality.

Your Contact

Andreas Gewis

Leitung Reymann Technik

Tel.: +49 (0) 6205 9407-0
Fax: +49 (0) 6205 9407-20

Email: agewis@reymann-technik.de

RATEC / Service

Downloads

You can find all information you need in our Downloadcenter.

Downloadcenter

The only source for precast formwork technology, that you need.

The new RATEC product catalog

Read online

Or order your free copy here.