Reymann Technik GmbH / Company / References / Doppelwand, Elementdecke, Massivwand & Sandwichwand u.a.

Double Wall, Solid Wall, Lattice girder slab

Performance RT: Planning & Projectmanagement

Plant capacity: 280 m² double wall/shift or 720 m² lattice girder slab/shift

Hall: Area 4.000 m², Clearance 13,85 m

Personnel: 10 employees/shift (double wall) 8 employees/Shift (slab)

Plant concept:

  • Double wall 180 - 500 mm
  • Special elements up to 600 mm
  • 32 pallets L/W 10,6/3,65 m extendable up to 18 pallets
  • Tilting bypass station
  • 2 compacting stations
  • Laser projection
  • Automated straightening and cutting for round steel
  • Possibility to produce core insulated double walls and special elements
  • Direct concrete transport from the existing mixing plant integrated inside the hall
  • sage of SCC is also possible
  • Divided hall
  • At the lift-off area it is possible to place 8 in-loader pallets ready for usage.

Project description

Our customer, a building company, demanded a plant with a high flexibility for products.

Partly the produced elements are used for own need and for the market.

Conclusion:

A plant with highly production flexibility, 3 stations for special elements and possibilities to extend.

Your Contact

Andreas Gewis

Leitung Reymann Technik

Tel.: +49 (0) 6205 9407-0
Fax: +49 (0) 6205 9407-20

Email: agewis@reymann-technik.de

RATEC / Service

Downloads

You can find all information you need in our Downloadcenter.

Downloadcenter

The only source for precast formwork technology, that you need.

The new RATEC product catalog

Read online

Or order your free copy here.